You are viewing this website using Internet Explorer 6 and some features of the website may not work properly as this browser is no longer supported. Please upgrade your browser to the latest version of Internet Explorer or Mozilla Firefox.

Harmonic

Helping our clients deliver excellence




Rotary Wing Engineering and Asset Management (E&AM) Convergence Programme

The multiple bespoke E&AM systems across the Military Air Environment resulted in a number of similar systems in use in different areas and some significant gaps in coverage. Harmonic was tasked by the MoD to identify and analyse the space, develop a strategy, facilitate the change programme and provide programme management support.

At contract start the E&AM support picture was diverse and complex:

  • Most RAF Fixed Wing aircraft and Rotary Wing fleets were supported by LITS EPMS
  • The Fleet Air Arm used WRAM for Rotary Wing fleets excepting Merlin which was being migrated to EHUDS. This was being developed as a ‘paperless’ system for Merlin with integrated HUMS and IETP functions
  • Army aviation was moving from paper records to a modified interim version of WRAM beginning with Lynx and Gazelle but with E&AM for the Apache undecided

Harmonic developed a programme strategy in conjunction with MoD senior managers. The delivery strategy evolved over time as individual requirements for change emerged and were developed into realisable projects, each was governed and delivered within the Convergence Programme.

Working towards the MoD objective of greater coherence in Rotary Wing E&AM solutions Harmonic examined all the options to bring E&AM to a common point thus facilitating the transition to, potentially, a single system.

The Result
Delivery of the E&AM Convergence Programme achieved more aircraft on fewer, better systems but it also:
  • Provided Army aviation with a single system, with its associated airworthiness and safety benefits
  • Brought 75% of Rotary Wing assets together, allowing the retirement of paper-based MI systems
  • Promoted a common look and feel as part of a customer- and use-focused development
  • Reduced the cost of owenership of the Rotary Wing fleet

 



Business Winning

How do I increase my win rate, reduce bid costs and win more business with less?

Business Winning

Performance Optimisation

Create sustainable advantage by executing and embedding strategy

Performance Optimisation

Assure and Deliver

Enabling client to achieve objectives and minimise reputational risk

Assure and Deliver

Resource Based Solutions

Flexible and rapid access to qualified and highly experienced Subject Matter Experts

Resource Based Solutions